Skip to content
Building Permit Records Look up a permit

Resources

47 pages on buildingpermitrecords.com, grouped by what they help with, and an A–Z glossary of terms you will meet in building and construction permit records.

Guides

How to search and read building and construction permit records, one question per guide.

Regional guides

Search instructions and official sources for each jurisdiction.

Directories and source tables

Official offices and portals, listed with what each one publishes.

Statsnet API wiki

Reference pages that describe Statsnet’s documented API for teams that need building and construction permit records in software.

  • Developers

    Permit files belong to the city or county building department.

  • AI agents

    An AI agent can extract company names from a permit printout and resolve them with Statsnet’s MCP tools.

  • KYB API

    Before hiring a contractor whose name appears on past permits, verify the company.

  • US entity lookup

    Resolving U.S. company names from permit records with Statsnet search, the limits of U.S.

  • Quickstart

    Requests that take a company name from a permit to a Statsnet entity: identifier resolution, public profile and relations, plus keys, quota and errors.

  • Contractor on a permit

    A permit’s contractor field is a name, sometimes with a license number.

  • LLC owner of record

    Many permits list an LLC or holding company as property owner.

  • Open permits

    An open permit is a city record; why it stayed open is often a company story.

About Building Permit Records

Who writes these pages, how sources are checked, and how to reach us.

Glossary

12 terms you will meet on Building Permit Records and on the official sites it links to, A to Z.

C

Certificate of completion
A document some jurisdictions issue when permitted work that does not require a certificate of occupancy, such as a remodel or trade job, passes final inspection. It formally shows the permit was closed out.
Certificate of occupancy
A document from the building department stating that a building or space complies with code and may be lawfully occupied for its intended use. It is typically required for new construction and certain changes of use, and lenders often ask for it.

D

Demolition permit
Approval required to tear down all or part of a structure. Jurisdictions commonly require utility disconnections, and some require asbestos surveys or historic review, before issuing it.

E

Expired permit
A permit that lost validity because work never started, stalled too long or did not receive a final inspection in time. Time limits vary by jurisdiction. Restarting usually means renewing or reapplying, and expired permits can complicate a sale.

I

Inspection
A site visit by a building official to check that work matches approved plans and code before it is covered or put into use. Failed inspections produce correction notices, and work usually cannot proceed past that stage until it passes.

O

Open permit
A permit still active on the record without a passed final inspection. Open permits often surface during real estate transactions and may need to be closed before sale, because responsibility for unfinished work can pass to the new owner.

P

Parcel number
The identifier the county assessor assigns to a piece of land, often called an APN or PIN. Permit records are frequently indexed by it, making it more dependable than a street address, which can change or be formatted inconsistently.
Permit history
The full list of permits issued for a property over time, with dates, scopes, contractors and inspection outcomes. Buyers and inspectors review it to spot unpermitted additions, open permits and the age of major systems.
Plan review
The building department's examination of construction drawings for compliance with building, fire, zoning and other codes before a permit is issued. Reviewers may return comments that the applicant must address and resubmit.

S

Setback
The minimum distance a structure must sit from property lines, streets or other features, as set by the local zoning code. Building into a setback without approval can lead to failed inspections or orders to remove the work.

U

Unpermitted work
Construction done without a required permit. It may have to be opened up for inspection, brought up to current code or removed, and it can affect insurance claims, appraisals and resale. Some jurisdictions offer a way to legalize it after the fact.

V

Variance
Permission to depart from a specific zoning requirement, such as a setback or height limit, usually granted by a zoning board after notice and a hearing. Variances generally require showing a hardship tied to the property itself.